Top Manufacturers
MORE
Stock

Displaying 2681 - 2700 of 12933

Evaluation Kits

Dual Remote Diode and Local Temperature Sensor with SMBus and TruTherm? Technology EVM

Texas Instruments
Dual Remote Diode and Local Temperature Sensor with SMBus and TruTherm? Technology EVM

Delta-Sigma Low Power Dual PLL for RF Personal Communications

Texas Instruments
Delta-Sigma Low Power Dual PLL for RF Personal Communications

Evaluation Module for TPS62140 a 2-A; synchronous; step-down converter in a 3x3-mm; 16-pin QFN

Texas Instruments
Evaluation Module for TPS62140 a 2-A; synchronous; step-down converter in a 3x3-mm; 16-pin QFN

TMP75C Evaluation Module for Digital Output Temperature Sensor

Texas Instruments
TMP75C Evaluation Module for Digital Output Temperature Sensor

TPS7A4001 Low-Dropout (LDO) Linear Regulator Evaluation Module

Texas Instruments
TPS7A4001 Low-Dropout (LDO) Linear Regulator Evaluation Module

SN65LVPE512EVM Dual Channel, Single Lane USB 3.0 Redriver and Signal Conditioner Evaluation Module

Texas Instruments
SN65LVPE512EVM Dual Channel, Single Lane USB 3.0 Redriver and Signal Conditioner Evaluation Module

4A, PowerWise? Adjustable Frequency Synchronous Buck Regulator Evaluation Module

Texas Instruments
4A, PowerWise? Adjustable Frequency Synchronous Buck Regulator Evaluation Module

Low Voltage N-Channel MOSFET Synchronous Buck Regulator Controller Evaluation Module

Texas Instruments
Low Voltage N-Channel MOSFET Synchronous Buck Regulator Controller Evaluation Module

Displaying 2681 - 2700 of 12933

Latest Parts

IN STOCK 1481
Buy

ASX00049

Arduino

* $44.73 - * $50.33

IN STOCK 2758
Buy

1687559

Phoenix Contact Ltd

[no prices available]

IN STOCK 3
Buy

Reference Designs

RD006

Wurth Elektronik

RD006 - 3 W Dual-output isolated auxiliary supply for communication interfaces and measurement systems

CN0583

Analog Devices Inc.

Multistandard Micropower Verified Smoke Detection System-on-Module

Technical Resources

EVALUATION KITS

EVAL-AD7124-8SDZ

Analog Devices Inc.

$0.00 - * $70.64

IN STOCK 792
Buy
View All